Shopping Centers
Altmarktgalerie Dresden (2010-2011)
Kälteerzeugung für die Erweiterung des Einkaufscenters 2mal 2800 KW CLIMAVENETA Schraubenkaltwassersatz und 1mal 170 KW Serverklimatisierung
Galerie Rostocker Hof (2010)
Komplettleistung R22 Ablösung Demontage von 2 Ciat Kolbenmaschinen und Installation von 2 CLIMAVENETA Schraubenmaschinen mit je 370 KW sowie ein in die Abluftanlage integrierter Verflüssiger
Retail Park Zeitz (2010)
DAIKIN VRV and split technology for the air conditioning of the different retail stores (Total cooling capacity: 174 KW)
Retail Park Werdau (2009 – 2010)
DAIKIN VRV and split technology for the air conditioning of the different retail stores
Retail Park Hainburg (2009)
DAIKIN VRV and split technology for the air conditioning of the different retail stores
Shopping Centre Plauen Kolonnaden (2009)
Partial air conditioning for the rented premises
Holstentor-Passage Lübeck (2008 – 2009)
CLIMATECH Berlin GmbH renovates the complete air-handling system in the shopping-, passage- and restaurant areas of the Holstentor-Passage in Lübeck. >> read more
Shopping Centre “Sachsen-Allee”, Chemnitz (2008)
Installation of two screw water chillers (one with external condenser for the conditioning of the cold water storage)
Ernst-August-Galerie, Hanover (2008)
R22-replacement by a CLIMAVENETA condensing unit with direct evaporation as a complete service and shop-fitting with DAIKIN split- and VRV-technology
Shopping Mall “Promenaden” at Leipzig Central Station (2007)
High-performance cooling system for Saxony’s number-one shopping mall: >> read more
Atrium Weimar (2005)
Installation of a screw chiller 600 kW with condenser and split-/VRV-systems
Riem Arcaden, Munich (2003 – 2004)
Main supply systems of the shopping centre: Ventilation and chilled water as well as fit-out of the renting spaces (stores): climate
Nova Eventis Günthersdorf (ab 2003)
Main supply systems of the shopping centre: Ventilation and chilled water as well as fit-out of the renting spaces (stores): climate
Kaufhof Galeria Leipzig (2000 - 2001)
Lüftung und Kälte
Amthor-Passage, Gera (since 2000)
Refrigeration contract since 2000, chilled water system 420 kW for the supply of the centre’s air-handling systems


